• Ain Nakhil, P.O.Box-1, Abqaiq-31992, Saudi Arabia

YANBU EXPORT REFINERY PROJECT

super kamagra tablets price in india Scope of Works:
Contractor shall furnish all equipment, tools, labor, supervision and materials and shall perform all operations and tasks required to provide the facilities for Yanbu Export Refinery Project. The facilities constitute the pipeline re-route and tie-in to the Yanbu Gas Plant. Other scope includes but not limited to the following: Construct the re-rote section of the SHY-1 26in pipeline from KP0+000 to new scraper trap at Yanbu Gas Plant, YGP by installing an underground pipeline in the T-5 corridor, crossing the TAMA Highway using the previously installed culvert and bringing the line into the new Scraper Trap Enclosure near the Yanbu Gas Plant where the line ends with V73-D-010. Install new SHY-1 26in scraper trap; construct connecting pipe and tie-in to the YGP. Construct the necessary utilities including utility water, utility air and firewater extension to the new scraper trap. Construct the new 30” laterial (30”-P-XXX1-9CS9P) on the existing sleepers. Connect the laterial on both spool ends by stringing and welding the pipe from V73-D-010 to the proposed tie-in location. The tie-in will require closing ZV-516 and ZV-517 to shutdown 24”-P-9506-9A2, empty and de-gas the main header (24”-P-9506-9A2) to allow cold-cut tie-in of 30”-P-XX1-CS9P. Complete the other in-plant work including the tie-in to the blowdown line. Support operations in commissioning the line as required. Tie-in the new 26” SHY-1 to the existing SHY-1 at KM 0.0. Demolition of existing SHY-1 scraper trap and redundant piping inside YGG after all tie-ins have been accomplished. Demolition and removal of existing SHY-1 pipeline buried across the Yanbu Export Refinery and the Remote Laydown Area. Install signs, markers, cathodic protection facilities, relocate fences, perform civil works and clean up and restore the work site and areas within YGP. PetroRabigh Pipelines Contractor shall construct a new re-route of the PetroRabigh Pipelines (6in YRBBTU-1) and 18in YRBETH-1.

 

Client's Company Name : Saudi Aramco
Date Awarded : July 2010
Saudi Arabia