• Ain Nakhil, P.O.Box-1, Abqaiq-31992, Saudi Arabia

SHAYBAH NGL PROJECT

maxalt usa Scope of Works:
The Scope of Work includes detailed design of the pipeline and ancillary facilities, material procurement, activities including procurement, inspection, expediting and transportation of contractor-supplied materials and equipment from point of origin to the job location, construction and commissioning of the pipeline and its associated facilities. Engineering and Detailed designing of 36” SHBABNGL-1 pipeline approximately 633 KM and its associated facilities. Construction of 36” new B/G Pipeline from Shaybah NGL to KM 633 near Abqaiq. Construction of 6 new Scraper Launcher/Receivers at different locations of the NGL pipeline from Shaybah to Abqaiq (SHY-NGL Scraper trap area, KM-211, KM-431, & KM 633) with handling facilities and all associated kicker lines, equalizing lines, blow down, drains & vent line piping. Civil/structural works associated with the construction of scraper launcher/receiver facilities and mainline isolation valve stations; Installation of 24” flow bypasses with a new isolation and check valve at Juaymah Gas Plant; Installation of 15 EA MOVs and 77 EA HOVs along the new NGL pipeline. Construction of one overhead power line (OHP) with pole-mounted transformer at KM-633 approximately 1.3 kilometer long; Hot tapping for jump over connections inside JGP Plant and for lateral connections at KM 633; Provide and install mainline valves assemblies; Installation of fenced burn pits for all scraper traps and mainline valve stations; Installation of FOC and other communication equipment. Install new RTU (5Ea) and upgrading of existing RTU (20Ea); Installation of C.P. Stations at 4 locations for the new pipeline sections from Shaybah NGL to KM-633.

 

Client's Company Name: Saudi Aramco
Date Awarded: June 2011
Saudi Arabia